|
Observing with LT: step-by-step quick reference click step titles for more details
|
For semester A (Feb-Jul):apply in Sep of previous year
For semester B (Aug-Jan):apply in March of same year
Submit PHASE 1 form to either PATT, JMU, CAT, or CCI TAGs:
|
|
If time awarded (~1 mth after deadline), your allocated time will be listed on the Allocations Pages, ordered by TAG.
|
Submit observation requests directly to LT via Phase 2 User Interface (phase2UI)
|
Receive email notification of observations;
download data from these links:
|
|
Please send us your details of publications
using LT data to the LT Support Astronomer
|
|
Telescope & Instruments
Telescope
Optics
Autoguider
Mechanics
Observatory Building
Site Location
Target Acquisition
Field Centering
Cardinal Pointing
Robotics
Robotic Control System
Scheduling System
Data Pipeline
Instrumentation
RATCam (CCD camera)
SupIRCam (IR camera)
RINGO (optical polarimeter)
MEABURN (spectrometer)
RISE (fast readout camera)
FRODOspec (spectrometer)
IO (Infrared-Optical camera)
Exposure Calculator
Standards
RATCam
SupIRCam
RINGO
Pipelines
RATCam
SupIRCam
RINGO
|
Important Dates
Proposal deadlines etc
Proposal Instructions: how to apply for time
Phase 1 Instructions
Time available
Instruments available
Calculating Time You Need
Applying through TAGs
MORE
Phase 2 Instructions
User Interface (UI)
UI Tutorial
Instructions
Sequence Builder
Sequence Builder Tutorial
UI user instructions for:
– RATCam
– SupIRCam
– RISE
– RINGO2
– FRODOSpec
Ephemeris Input
About Short Proposals
About OPTICON
Allocated Time (TAG Results)
PATT
JMU
CAT
CCI
GRB Followup
Important Notes
Post Rapid Form
Data Products
Daily Procedures
Observations Log
Photometric Standards
Quicklook
Data Archive
|